caltrane74
Senior Member
It is a steel structure. The CIP concrete residential portion will be built on top of the steel table top platform which is being constructed right now.
So the new exoskeleton will be bearing the entire weight of the addition? The new building will essentially be straddling the old one, but not actually resting on it (in terms of weight transfer)?the weight of the new addition will be transferred to the structural steel exoskeleton that extend down to the bedrock so that there won't be any stress on the existing structure.
Wow. This project has always struck me as both ambitious and a bit nutty -- is this particular location so desirable, and the existing building so valuable, that further height via this technique is warranted? Has anything like this been done elsewhere in Toronto?