The visible progress this week is the south podium (with the heritage facade), which has grown to 5 stories. 2 more to go I believe.
 

marcus_a_j

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
3,087
Reaction score
976
Location
Danforth
The visible progress this week is the south podium (with the heritage facade), which has grown to 5 stories. 2 more to go I believe.
They are laying the rebar for the fifth (and final) floor. Next would be the elevator core then the roof. Maybe 3 weeks until the south podium is structurally complete?
 

Rascacielo

Senior Member
Member Bio
Joined
Jun 5, 2017
Messages
1,698
Reaction score
10,057
Location
Toronto
They are laying the rebar for the fifth (and final) floor. Next would be the elevator core then the roof. Maybe 3 weeks until the south podium is structurally complete?
In this picture from the database, there are 3 floors above the heritage facade. 2 of the 3 floors are now up. Also, as far as I can see from the actual construction, the first 3 floors of the south podium align with the 3 floors of the heritage facade (relatively low ceiling heights).

The One.jpeg
 

marcus_a_j

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
3,087
Reaction score
976
Location
Danforth
In this picture from the database, there are 3 floors above the heritage facade. 2 of the 3 floors are now up. Also, as far as I can see from the actual construction, the first 3 floors of the south podium align with the 3 floors of the heritage facade (relatively low ceiling heights).

View attachment 299710
Correct, they are two storeys above the heritage facade. The lower two floors of the heritage building are level 1 and level 1 mezzanine on the architectural drawings for The One. They will be pouring the floor for level 5 (the red line below).

east elevation.JPG
 

Rascacielo

Senior Member
Member Bio
Joined
Jun 5, 2017
Messages
1,698
Reaction score
10,057
Location
Toronto
Correct, they are two storeys above the heritage facade. The lower two floors of the heritage building are level 1 and level 1 mezzanine on the architectural drawings for The One. They will be pouring the floor for level 5 (the red line below).

View attachment 299718
So there are 3 floors behind the heritage facade, but the first 2 are both called Level 1. From Yonge St the second Level 1 doesn't look like a mezzanine either - you can see a floor slab, although it's hard to tell how deep it is (if it doesn't go all the way to the back of the building, it could be a mezzanine). Meanwhile, mechanical floors between each set of hangers in the tower will be counted as actual floors. Fire department is going to have a lot of fun with this One.
 

marcus_a_j

Senior Member
Member Bio
Joined
Apr 23, 2007
Messages
3,087
Reaction score
976
Location
Danforth
So there are 3 floors behind the heritage facade, but the first 2 are both called Level 1. From Yonge St the second Level 1 doesn't look like a mezzanine either - you can see a floor slab, although it's hard to tell how deep it is (if it doesn't go all the way to the back of the building, it could be a mezzanine). Meanwhile, mechanical floors between each set of hangers in the tower will be counted as actual floors. Fire department is going to have a lot of fun with this One.
The mezzanine level only covers about a third or half of the podium area, so no, doesn't go all the way to the back. Looks like it's just above the ramps to the underground parking levels and mostly used as garbage rooms. Right behind the heritage facade is "open to below" on the mezzanine level, which is a restaurant/retail space.
 