Correct, they are two storeys above the heritage facade. The lower two floors of the heritage building are level 1 and level 1 mezzanine on the architectural drawings for The One. They will be pouring the floor for level 5 (the red line below).In this picture from the database, there are 3 floors above the heritage facade. 2 of the 3 floors are now up. Also, as far as I can see from the actual construction, the first 3 floors of the south podium align with the 3 floors of the heritage facade (relatively low ceiling heights).
View attachment 299710
So another floor they'll be topped out on the podium bit?They will be pouring the floor for level 5 (the red line below).
So there are 3 floors behind the heritage facade, but the first 2 are both called Level 1. From Yonge St the second Level 1 doesn't look like a mezzanine either - you can see a floor slab, although it's hard to tell how deep it is (if it doesn't go all the way to the back of the building, it could be a mezzanine). Meanwhile, mechanical floors between each set of hangers in the tower will be counted as actual floors. Fire department is going to have a lot of fun with this One.Correct, they are two storeys above the heritage facade. The lower two floors of the heritage building are level 1 and level 1 mezzanine on the architectural drawings for The One. They will be pouring the floor for level 5 (the red line below).
View attachment 299718
The mezzanine level only covers about a third or half of the podium area, so no, doesn't go all the way to the back. Looks like it's just above the ramps to the underground parking levels and mostly used as garbage rooms. Right behind the heritage facade is "open to below" on the mezzanine level, which is a restaurant/retail space.So there are 3 floors behind the heritage facade, but the first 2 are both called Level 1. From Yonge St the second Level 1 doesn't look like a mezzanine either - you can see a floor slab, although it's hard to tell how deep it is (if it doesn't go all the way to the back of the building, it could be a mezzanine). Meanwhile, mechanical floors between each set of hangers in the tower will be counted as actual floors. Fire department is going to have a lot of fun with this One.
Today.
Those grey tubing thingamabobs coiled, packaged and ready to be used I gather.What are those two toilet seats, and the hard-boiled egg slicer?
They were there before the slab was poured, you can see them on my post in mid December # 8,326...they're there now!!
Now come to think of it...They were there before the slab was poured, you can see them on my post in mid December # 8,326
Those Kotsy Street signs had me very confused for like 5 mins damn
The intersection of Kotsy/Kotsy is shaping up well