vinny_the_hack
Active Member
I don't think Sam's taking car trade-ins just yet.Only $3,000! I had no idea there was a fire sale going on.....Let me get my VISA car and put me down for a floor's worth!
I don't think Sam's taking car trade-ins just yet.Only $3,000! I had no idea there was a fire sale going on.....Let me get my VISA car and put me down for a floor's worth!
Only $3,000! I had no idea there was a fire sale going on.....Let me get my VISA car and put me down for a floor's worth!
Did you mean $3 million and up?I believe the units that are available are selling for $3k and up.
Yes.Did you mean $3 million and up?
...that appears to be the same for the other 3 corners.Wow, the slab at that suspended corner still hasn't been poured.
Thanks thaivic for a respite from the doom and gloom…
We'll wait for @Contra to make their amazing progress illustrations, but till then, here's where we're at right now. I believe from the overhead pictures, we're done with 3 of the hotel levels, bringing us to 44.81m per the drawing. We've currently poured the floor for Level 10.
View attachment 404807
We'd have to get to Level 43 in order to beat the CIBC building across the street. For reference, it's 4 levels above the 2nd mechanical section of the building.
Still have a bit to go before it gets to the "concrete strip" (mechanical) levels on 2 Bloor West. The One is probably about the 11th level of 2BW.Got a better look at it today. Again, just certain angles make it look taller then it is, but the current height is where concrete strip in the middle of the CIBC building is. Kind where the top of the crane is this pic.View attachment 405786