Toronto The One | 328.4m | 91s | Mizrahi Developments | Foster + Partners

Today.
F3FD2FDC-AFAC-4FEA-9F2C-3A6B7DD82AAB.jpeg
80CDAB58-B23B-4200-B53C-A049E4F88BC3.jpeg
3C15F920-2BE6-4E15-8945-0424F98C23EB.jpeg
E9BC24A1-D01E-4181-8FDC-849ADDD9B433.jpeg
A6CF1B3B-8459-4888-B299-D333C0581D2E.jpeg
D7F2E53F-B614-433B-B85B-8E60FFEDD72E.jpeg
35623BEE-9D9E-4AD1-A5E5-8A330FBE84CF.jpeg
 
Am I correct to observe that the super-columns are turning into just reinforced concrete and there will be no more steel sections installed?
Makes sense. After the podium is done it would be likely overkill ...and they must cost a fortune.
 
Am I correct to observe that the super-columns are turning into just reinforced concrete and there will be no more steel sections installed?
Looks like they are being formed out from the next concrete pour, which would lead me to think that we might see another super column metal prefab piece placed on top of the current column tops?
 
Looks like they are being formed out from the next concrete pour, which would lead me to think that we might see another super column metal prefab piece placed on top of the current column tops?

They're getting ready for the floor pour though. If they have another super-column prefab piece, then now would be the time to install it, before pouring the floor of the next level.
 
Like I said above, they look like they are being excluded from the area that will be poured.

Apologies, didn't read your post or look at the pictures correctly to notice that the super-column sections are formed out of the floor pour. You're right, we might get another, smaller panda. But the design only states steel sections are required for the 2 Yonge Street side super-columns. Who knows! But the pace they're working, we're bound to find out in the next few days!
 

Back
Top