Photos taken today, Friday (June 2). Up one more level since I posted last weekend, as can be seen by the various views. Are we on 30/31 now? Looks like the crane will soon by raised, and it seems the rest of the hanging platforms will be added over the weekend and on the other days as per that construction work notice posted here the other day. Along with the "time-lapse" update photo and south/east/west elevation shots, a closer view of the mechanical floor now that the scaffolds have been raised, and a closed-down aperture shot that admittedly features 1 Bloor E more than 1 Bloor W... The south elevation shot was taken on Yonge Street at Alexander.
The Flickr "time-lapse" album Oct 2020-Jun 2023 now updated:
The Flickr "time-lapse" album Oct 2020-Jun 2023 now updated:
The One (1 Bloor West) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...
www.flickr.com
Last edited: