Well, the recent 100bps rate hike, and the concrete shortage cannot be doing this project any favors. At this point I will be very surprised if this project is completed under the Mizrahi banner.

Does anyone know how much of the condos are sold in this project?
 
We've got a new front page story with a new fly-through video of the sixth floor amenity spaces, here!

42
 
Well, the recent 100bps rate hike, and the concrete shortage cannot be doing this project any favors. At this point I will be very surprised if this project is completed under the Mizrahi banner.

Does anyone know how much of the condos are sold in this project?
The construction financing in place would be a fixed rate...
 
Done.
D67E28C4-0905-46DE-AD5E-6D0C4016DB8C.jpeg
FDFF5E30-2068-4105-BBE6-B6D7518343A5.jpeg
CC158C4B-2D95-431B-9C98-FCC087031D3E.jpeg
42642834-C0BC-4C53-A339-67BFAD7C7FBB.jpeg
2BEAA240-4E75-4A29-9B87-6CFF666536F7.jpeg
8E311D90-62DE-4F22-9424-7ACB3C1DDE72.jpeg
D1976B35-50B5-4BDA-8B38-5623FE21C9A3.jpeg
4E659F83-5983-4D1B-97F3-11A66E415FA0.jpeg
BB4D72DB-14E1-4DB5-9AC5-6467CC119F53.jpeg
 
So this is different… previous slabs don’t have this ridge of exposed rebar along all the outer edges, but they do have clearly visible hardware for attaching the curtainwall, which I don’t see in this one. Curious to know what‘s different or changing at this level.🤔


📷: @Benito

56A34C41-BEBA-426C-B125-396F4E59DB33.jpeg


Previous slab (May 30).

📷: @Benito

4F1B5DDD-B723-463F-87DC-EB9A64211B4F.jpeg
 
Last edited:
So this is different… previous slabs don’t have this ridge of exposed rebar along all the outer edges, but they do have clearly visible hardware for attaching the curtainwall, which I don’t see in this one. Curious to know what‘s different or changing at this level.🤔


📷: @Benito

View attachment 413811

Previous slab (May 30).

📷: @Benito

View attachment 413812

I believe we’ll be seeing this every 6 floors, where a new section begins with the next set of ‘hangers’. See the image below where the bronze cladding accents wrap the sections: