Just The One crane.
Second pour. The first one was already done for the ground level deck.That's going to be a hell of a first pour.
well the blue base its for 1 crane the area its small and one can cover all that..
Second pour. The first one was already done for the ground level deck.
looks way to large size for a crane base...I think you meant the one with the "x" is the crane base. The blue base is for the concrete pump as mentioned above.
Second pour. The first one was already done for the ground level deck.
looks way to large size for a crane base...