Photos taken yesterday, Friday (Mar. 1). Dramatic news since my last update a week ago with the announcement that Sam Mizrahi will be removed from the project and Skygrid will take over Mar. 13. Meanwhile, the building itself continues to progress. The blue forms at top have moved up one level, at least on the west side, I think they are up to floor 55. The blue corner forms are up as well, to level 44 or so. The Rail Climbing Systems haven't moved up since last Friday, so we don't see more of the first mechanical level. But on the south side the new black scaffolds to the left of the crane have expanded and we have some more cladding on the super columns at the mechanical level. And more sidewalk was poured today on the Yonge Street side of the tower (not pictured).
Starting with my usual addition to the Flickr "time-lapse" album, views from the south on Yonge, from Dundas, and more views of the south including the mechanical sections. They seemed to have figured out their issue with "4" as the stencilled numbers on the elevator doors are no longer backwards starting with level 43... Some shots of equipment being hoisted up, then the view from by Holt Renfrew on Bloor, a few shots from Cumberland east of Bay, then a new view from Cumberland around Yorkville Park, finally the view from Bloor and Bedford, 1 Bloor W now covering a lot of 1 Bloor E.
Starting with my usual addition to the Flickr "time-lapse" album, views from the south on Yonge, from Dundas, and more views of the south including the mechanical sections. They seemed to have figured out their issue with "4" as the stencilled numbers on the elevator doors are no longer backwards starting with level 43... Some shots of equipment being hoisted up, then the view from by Holt Renfrew on Bloor, a few shots from Cumberland east of Bay, then a new view from Cumberland around Yorkville Park, finally the view from Bloor and Bedford, 1 Bloor W now covering a lot of 1 Bloor E.
The One (1 Bloor West) "time-lapse"
From October, 2020, as above-ground construction started in earnest at The One (1 Bloor W.) in Toronto. More or less a weekly photo usually taken on a Friday, with some gaps during early-on construction hiatuses. The initial photographs are from 2015, during demolition at the site, 2018, during...
www.flickr.com