Toronto The One | 308.6m | 85s | Tridel | Foster + Partners

Today.
03651EE9-C587-4B3A-9832-19AC69ACF56F.jpeg
8AADB80E-C404-41CC-9F78-D1EA00EF854A.jpeg
979C5809-B5A4-45AF-996C-9455C228B34C.jpeg
29A696C6-EF41-431C-BD52-6666DDD10625.jpeg
DFD5AB0A-F8C5-4784-8E32-1661EAC6B49B.jpeg
2C597921-CFC9-49D8-BDBA-BAFF525382C7.jpeg
B79F95AD-AF1A-4C1C-86F7-8267750928F5.jpeg
 
Wow there is a lot of concrete in this monster: walls three to four feet thick and look at the depth of the floor they are framing on the west side which seems like it is three feet deep!
 
They're going about this floor a bit differently this time, as they also seem to be prepping for the floor above it at the same time...

...maybe they're getting tired of the "going too slow" comments here and decided to pick things up a bit. 😼
 
We need a new set from Thaivic (not that Benito's work isn't excellent and always anticipated) to get another view of that Bloor Street side to see what they are forming. That was some fast work too from yesterday to today, maybe they lifted and placed that rebar already assembled instead of building it in place?

edit - It looks like they're doing the same thing on the south side (next to the concrete pump).
 
We need a new set from Thaivic (not that Benito's work isn't excellent and always anticipated) to get another view of that Bloor Street side to see what they are forming. That was some fast work too from yesterday to today, maybe they lifted and placed that rebar already assembled instead of building it in place?

edit - It looks like they're doing the same thing on the south side (next to the concrete pump).
I myself am hoping @Anthonylipson1996 hasn't disappeared completely.
 
We need a new set from Thaivic (not that Benito's work isn't excellent and always anticipated) to get another view of that Bloor Street side to see what they are forming. That was some fast work too from yesterday to today, maybe they lifted and placed that rebar already assembled instead of building it in place?

edit - It looks like they're doing the same thing on the south side (next to the concrete pump).
Need to be cleared of Covid.
 

Back
Top