Toronto The One | 308.6m | 85s | Tridel | Foster + Partners

The beams are being incased thickly in concrete ( below floor level) to act as transfer slabs, the floor itself will be much thinner and higher, you can see the vertical form work. These transfer slabs will support the interior core walls.
 
Taken this afternoon
20210519_180642.jpg
 
Today.
5C0D1165-8B69-4967-A130-FF861BFD93BC.jpeg
2F3DE4BC-C34A-4A18-99CD-777FCA415A85.jpeg
DCC43CAD-E496-42C4-BD82-5042152DFB83.jpeg
 

Attachments

  • 53049F02-27ED-4750-8010-3016536486DD.jpeg
    53049F02-27ED-4750-8010-3016536486DD.jpeg
    432.2 KB · Views: 161
  • 55A788AB-2DB3-450C-BB4B-2D2215616470.jpeg
    55A788AB-2DB3-450C-BB4B-2D2215616470.jpeg
    449.7 KB · Views: 148
  • 9BF2088F-0E9D-417B-BB50-39C6736CD63C.jpeg
    9BF2088F-0E9D-417B-BB50-39C6736CD63C.jpeg
    464.1 KB · Views: 143
  • 84936B84-ABFA-46BE-B36F-6A0CF16048DE.jpeg
    84936B84-ABFA-46BE-B36F-6A0CF16048DE.jpeg
    417.4 KB · Views: 135
  • 03E087FA-D082-44B4-AE99-3FA859E336B8.jpeg
    03E087FA-D082-44B4-AE99-3FA859E336B8.jpeg
    404.3 KB · Views: 150

Back
Top