Toronto The Gloucester on Yonge | 147.82m | 44s | Concord Adex | a—A

Crane being installed today.
DFA56EA5-8498-4BDE-8F06-EEE0ED18BAB1.jpeg
 

Attachments

  • DFA56EA5-8498-4BDE-8F06-EEE0ED18BAB1.jpeg
    DFA56EA5-8498-4BDE-8F06-EEE0ED18BAB1.jpeg
    373.5 KB · Views: 708
When I walked by yesterday, the boom of the crane was literally within 2 metres of the roof of the Masonic Hall... it looked really sketchy.
IMG_1849.JPG
 

Attachments

  • IMG_1849.JPG
    IMG_1849.JPG
    197.4 KB · Views: 657
Last edited by a moderator:
…and yesterday:

DSC04431.jpg


42
 

Attachments

  • DSC04431.jpg
    DSC04431.jpg
    763.2 KB · Views: 624

Back
Top