Toronto Sugar Wharf Condominiums (Phase 2) | 283.6m | 85s | Menkes | a—A

Interesting that the permit suggests the entire building would be demolished, retaining only the north facade. Renderings suggest that only the south facade would be demolished.

28462-138293.jpeg

UT
Maybe they're planning on rebuilding the east and west facades by leveraging the demolished bricks? It might have something to do with the quality of the other sides.
 
Pictures from Aug 15 to last night.

A4C28A9A-D262-4C2F-A7C4-EAD989AD8AD7.jpeg


E2251CEA-C354-4426-919B-044BB8C89FEC.jpeg


This looks like a tedious labour intensive task. Like shoveling wet heavy snow.
4CD63117-2A1C-4F2D-9CD5-CA9BFC0F2212.jpeg


Is this a heritage piece?
53036F38-89E8-41CA-BAB6-C01B415B6FFD.jpeg


D227A601-94D1-4465-9A9F-95CC5336989B.jpeg


All the window bars were boxed up and removed from site. Assuming to be re-installed?
E3EC9634-0306-4821-8C83-F94C0E81F765.jpeg


0CDDB002-6EDA-4F2A-8DE8-3ECF38597918.jpeg


6870F197-D9EF-4EC2-A87D-514B62BA79D7.jpeg


open the door or else.
4D78CD8B-1D36-4216-B245-3D0F8CE5B361.jpeg


That’s one way to remove the contents.
641DDDD4-A78D-471A-A483-5C7B7F9FBB1A.jpeg


82B5A9CF-75A6-4FF9-8311-33EF010520EC.jpeg
 