Toronto Sugar Wharf Condominiums (Phase 2) | 299m | 90s | Menkes | a—A

Work is continuing today. The work is limited to the area of the new road.

1721677609218.jpeg
 
The road separates the building from the park and there was info posted last fall about park construction. I assume the City want the road done before they start park building??

I posted this on March 15 - I think sign is long gone.

1721679162873.png
 
Last edited:
The road separates the building from the park and there was info posted last fall about park construction. I assume the City want the road done before they start park building??

I would think that the Harbour road re-routing and this road would have to be completed prior to the start of the third Pinnacle One Yonge building. Any change that might also be moving this along?
 

Back
Top