Toronto Sugar Wharf Condominiums (Phase 2) | 283.6m | 85s | Menkes | a—A

A6435-3-2.jpg

Fall Sunset on Sugar Wharf. Oct.30.2024
 
...I presume they are planning to shore around that drain installation, unless they are planning to levitate it somehow during excavation and to grade construction.
 
I see them move a lot of dirt around but does anyone know what the heck they're even doing. What's likely the next thing theyre buildinh
G. School, condos or park or something else?
 
I see them move a lot of dirt around but does anyone know what the heck they're even doing. What's likely the next thing theyre buildinh
G. School, condos or park or something else?
As discussed above, it is the preparations for the PARK - which is the southern part of this site.
 
As discussed above, it is the preparations for the PARK - which is the southern part of this site.
DSC, there's no official renderings or plans for the park yet, correct? I think I remember seeing a rough vision, but it hasn't gone through the city?
 
DSC, there's no official renderings or plans for the park yet, correct? I think I remember seeing a rough vision, but it hasn't gone through the city?
I think there are 'renderings' somewhere in UT but I have certainly not seen final (or any real) plans. A vision probably describes it very well, now a vision WITH drains!
 

Back
Top