Toronto Sugar Wharf Condominiums (Phase 1) | 231m | 70s | Menkes | a—A

FE7A9C6C-5F56-4778-9F78-287DF8DB2819.jpeg

East Bayfront beginning to look like real urban fabric in this photo!
 
Going past this, CIBC Square and other developments further west is like a development/skyscraper geek's gauntlet
Yeah, love it:cool:
...a bit off topic but i hope this crazy thought by city council doesn't slow all this construction down:(

7,000 jobs under threat as Toronto moves to restrict critical concrete work for high-rise construction
The City of Toronto is poised to restrict concrete work for the construction of high-rise buildings through amendments to the noise bylaw in a move that will threaten more than 7,000 jobs and cripple the industry's ability to deliver much needed housing supply to Torontonians.
More.... https://www.newswire.ca/news-releas...ork-for-high-rise-construction-859067985.html
 
Last edited:
Advertising inside the pit. See the next picture.
NW corner crane and base prep. almost done. Probably another pour next Saturday; long weekend?
E8D6B3E6-554A-45A6-A9A4-0F2950B85E1A.jpeg

Another photo day with the drone crew. Nice back drop, clear blue sky. Where are their pictures?
5579D816-83E0-4E08-8AD1-F2CDF21D4937.jpeg

Tower core and columns vs podium column thickness exposed.
C7D0398F-4816-4201-AC4C-6AE6499F76EF.jpeg
CDD93392-267C-4D88-A827-9D09196DEFF9.jpeg
305DC29C-253F-4B2C-B665-B6E17A93615A.jpeg

No accidents today.
6E9C9B20-FCEA-4C38-9B0B-C7D796CE8C31.jpeg
 
April 21
They have place gravel on top of the base that will see a concrete floor pour on top of it.
33804967938_5c23e9e3a2_b.jpg

47682435091_8b2f2cc6b3_b.jpg

47629524592_e4f31fc416_b.jpg

33804965018_94983dc5b0_b.jpg
 
They pour ~10’ of concrete for the base and then add a few more for the drains.
39F983AC-1FC5-4261-9D2C-97CD1E574617.jpeg

New construction camera, permanent or for the next big pour. Hopefully they get better weather this time for a good video.
B1F123CD-8EC7-4163-8A02-8929F62385C2.jpeg
67D6BB89-5713-4B88-863F-1724984B5E84.jpeg

April 23
C161B96D-A293-4F0A-ABD1-01E0978FB32C.jpeg
 

Attachments

  • E534B9E7-E39B-4324-A24F-F885C05CDC33.jpeg
    E534B9E7-E39B-4324-A24F-F885C05CDC33.jpeg
    263.1 KB · Views: 328
Saturday.
3 direct pours every 5-6 minutes per truck must have been limited in their distribution. A minimum of 6 hours maybe up to12 hours of non stop trucks.
ADBC7018-5F1B-4B5C-A29C-E4315665C49B.jpeg

3:30 pm 5 pumped lines a lot slower
B84FEBA8-8800-43FB-9489-AF58AE7EAA8E.jpeg

Still pumping 3 lines at 6 pm over 15 hours later
70DE9F54-2329-4CAD-8E52-54A9B3014E7F.jpeg

Sunday - Phase 1 breaking grade.
EB8CE320-FCCC-496C-9F28-2218ADD672FE.jpeg
12436D65-38F8-46D1-877B-DF85594349CC.jpeg

The foundation is set.
Another crane later this week?
DD8238AE-64A5-4ADC-AF02-51262F4F7C9E.jpeg
 