kEiThZ
Superstar
Knowing how much time will have passed between EA completion on the Spadina-York extension and the time drilling starts, the Eglinton line might be ready for drilling about the same time these drills are finished their duties.
Hopefully. The other issue is the claim that since they don't know what size the vehicle will be they don't know how big a tunnel they want. I find that odd. I would have though that a tunnel big enough to fit a subway train could probably fit a LRT as well. Sounds to me like they are already backing away from the pledge of building Eglinton so it's upgradeable in the future.