Thread should be Sherway Gardens Expansion (2s + 3s Parking garage, 2s, Nordstrom + Saks, Dialog Architects)
July 11 and over 100 photos up on site.
Since I was in the area and killing a few things at the same time, decided to catchup what taking place at the mall since my last visit.
The first 2 levels of the parking structure is now open with the 3rd close due to construction.
The final steel beam for the expansion is waiting to be place and workers to sign it, but will be some time before it place.
They are saying Nordstom will not open until 2017 since the signs inside the mall have been change for that date.
Work is under way for the expansion of Saks and looks like that area of the current parking lot will be 2/3 story of parking and the expansion.
The inside of the mall getting redone as well. Its too bad they can't raise the ceiling of the mall in most areas as they are to low and lack light.
From the mall, Hudson's has seen a make ovre as well.
New entrance to parking structure off the Queensway