Toronto Raglan House | 91.95m | 28s | Camrost-Felcorp | Arcadis

Pulled from the launch teaser trailer:

1674658208422.png
 
  • Like
Reactions: PMT
Hmm, that's hella quick if they were able to do shoring, excavation and crane installation within 2 and a half months or so. Time frame based on the last photo update from March.

I think that may possibly be for Groove Condos:

 
Last edited:

Back
Top