Mississauga PSV 1 and 2 | 144.77m | 48s | Amacon | Turner Fleischer

DJI_0063_zpsavcgzkeh.jpg
 
Sept 4
First crane down with the 2nd to follow in the next week or so
29410303621_d0bb7bd5e2_h.jpg

29381802632_bb9e0ea2c9_h.jpg

28868015843_c03d8a71ae_h.jpg

28868028413_d2f6c13549_h.jpg

28868037333_0a452da664_h.jpg
 
Oct 5
The jib crane was being install today and the tower crane could be down by the weekend or early next week. This will leave only the Pinnacle Grand Park II in the skyline for the city core until early 2017. It will be about 2019-20 before we see anymore cranes in the skyline for the core.
30030303302_a2708f71d7_h.jpg

30144514685_39aa938ede_h.jpg

30109648696_2c51f84452_h.jpg

29849009990_6380bf0b42_h.jpg

30144520735_aac905e3cc_h.jpg

30109695116_c2631db1d0_h.jpg
 
Just a bit of a look at the towers, which are now showing more signs of interiors being completed, with the now-animating façade:
SN016370.JPG
SN016292.JPG
SN016299.JPG
SN016302.JPG
SN016362.JPG
 

Attachments

  • SN016370.JPG
    SN016370.JPG
    2.1 MB · Views: 640
  • SN016292.JPG
    SN016292.JPG
    2.2 MB · Views: 616
  • SN016299.JPG
    SN016299.JPG
    2 MB · Views: 594
  • SN016302.JPG
    SN016302.JPG
    1.9 MB · Views: 627
  • SN016362.JPG
    SN016362.JPG
    2.2 MB · Views: 653
These turned out quite nice. Any word on what retailer will be taking up the retail units yet?

IMG_1498.PNG
 

Attachments

  • IMG_1498.PNG
    IMG_1498.PNG
    1.6 MB · Views: 598
IMO, this phase is a lot clumsier in terms of the streetlevel/podium but it offers a better tower design. I'm unimpressed, though there are signs saying leased and vacant retailers. Theres already a gym of some sort moving into one retail bay. I would post a pic of these...but there's no point if there already done and just getting retail in.
 

Back
Top