Toronto PRIME Condos | 148.43m | 46s | CentreCourt | Arcadis

Today

1DF87F1A-7B3C-4BC8-82E7-097C0966EC14.jpeg


548C5899-1A44-4C30-9F5A-4537F452494C.jpeg
 
How does CentreCourt work so quickly? It hasn’t even been a year since this reached grade and we’re past halfway?

They’ve managed to do pull this off with 55 Mercer too.

And from what I can see they’re both quality builds, on the outside.
Yes, they're fast. The crew's usually working on Saturdays. I bet by the end of this week half of the 25th floor will have been formed, although work may slow down tomorrow due to the storm.
 

Back
Top