Toronto Pinnacle One Yonge | 351.85m | 106s | Pinnacle | Hariri Pontarini

Today

IMG_1468.jpeg


IMG_1465.jpeg
 
IMG_4026.jpeg

Phase 1 podium (condo and/or rec centre) roof still not in use for some reason above. Why - Anyone?

Working on the hotel pool. Phase 1 indoor pool still closed? (Draining/unloading the pool caused stress issues?)
IMG_9420.jpeg



Ground level moving along. - slowly
IMG_9419.jpeg



Slow, expensive and very nice balcony work still in progress.
Very little (if any) OCD issues with any broken/missing windows, balcony glass, etc. Just this different balcony feature. It should move quicker now.
IMG_9421.jpeg


1,000th delivery of drywall.
IMG_9424.jpeg


Mechanical level opening for grilles? Level 68
IMG_9418.jpeg


IMG_9426.jpeg


Glazing back in stock!! Level 79 and 80
IMG_9417.jpeg


Hoist moving up to 85/86/87/88?
IMG_9423.jpeg


Level 99?
Balcony level 88, curtain wall level 89
IMG_9422.jpeg


The shady north side
IMG_9425.jpeg
 
View attachment 696847
Phase 1 podium (condo and/or rec centre) roof still not in use for some reason above. Why - Anyone?

Working on the hotel pool. Phase 1 indoor pool still closed? (Draining/unloading the pool caused stress issues?)
View attachment 696845


Ground level moving along. - slowly
View attachment 696844


Slow, expensive and very nice balcony work still in progress.
Very little (if any) OCD issues with any broken/missing windows, balcony glass, etc. Just this different balcony feature. It should move quicker now.
View attachment 696842

1,000th delivery of drywall.
View attachment 696838

Mechanical level opening for grilles? Level 68
View attachment 696843

View attachment 696836

Glazing back in stock!! Level 79 and 80
View attachment 696841

Hoist moving up to 85/86/87/88?
View attachment 696839

Level 99?
Balcony level 88, curtain wall level 89
View attachment 696840

The shady north side
View attachment 696837
You invariably provide the newsiest, juiciest images and text.
 
Level 100 388.35-77m =311.35 m
One Bloor West 308.6m
IMG_8779.jpeg


IMG_9440.jpeg


Crane climbing and filling in the old holes down below. Hmmm. No holes to fill.
IMG_9436.jpeg


The glazing is back in progress on level 79. First row of windows at an angle between 78 and 79
IMG_9435.jpeg


More balcony glass
IMG_9433.jpeg
 

Attachments

  • IMG_9434.jpeg
    IMG_9434.jpeg
    736.3 KB · Views: 14
  • IMG_9437.jpeg
    IMG_9437.jpeg
    931.8 KB · Views: 19
Last edited:

Back
Top