Toronto Pinnacle One Yonge | 351.85m | 106s | Pinnacle | Hariri Pontarini

I think that there might be a staggered process to them pouring floors that they are technically accomplishing more than a floor a week I have watched pictures of the climbing frame and it very much seems like they pour floors in the same pattern that they did with the transfer slab they do one side one night then they do the middle the next and the far side the next I imagine if you were to look from above when this process is going You would see almost a staircase effect with the slabs
 
Finally seeing it up close, it really is tall now 😵‍💫

IMG_0770.jpeg

IMG_0777.jpeg
IMG_0781.jpeg

For comparisons sake, here’s a picture from April:
20240413_103540.jpeg
 
Here are several photos I took of Pinnacle One Yonge this afternoon, starting from the Time


From York and Bremner this afternoon:
View attachment 623629

I never realized how much this building would be seen in the background from this view. This is awesome and going to make for an even better back drop when it's finished.
 