Collingwoodbuildinglover
Active Member
So without a doubt this will be taller than prestige most likely by the end of summer at least the crane will be
Very looking forward to seeing this graph completed as the tower climbs. My only quibble is the spelling "meter", which in Canada refers to an instrument which measures, whilst a unit of measurement is a "metre".Went with a @Contra style update today.
View attachment 572988
This is how much more it has before it tops out.
View attachment 572987
If they construct every floor once a week, then it will take roughly a year and a half to top out.