Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

Aug 19
53185817560_6e094e3fc9_b.jpg

53185988428_1e3ca76d92_b.jpg

53185614431_2ae41a2dd8_b.jpg

53184905337_ed843d9eb4_b.jpg

53184905337_ed843d9eb4_b.jpg

53185614626_8efd727741_b.jpg

53185818125_742503432e_b.jpg
 
Next week, you should also see one of the major components to finish the building installed.

Maybe they are installing a new pee pad? Where is a dog to go? It’s a 500m concrete walk to get here. Not a stitch of grass on our route here..
IMG_7026.jpeg


Maybe this is the big news.
IMG_7023.jpeg


Or maybe this!
IMG_7029.jpeg

They could probably lift the crane from the street any day as Yonge St north bound is blocked off for the water-main construction. Maybe it will be tomorrow?


The last hotel floor. The next floor is residential.
_N8A1660.jpeg


_N8A1662.jpeg


IMG_7021.jpeg


North end where the other original crane was located.
IMG_7019.jpeg


New sidewalk to lake shore.
IMG_7018.jpeg


Maybe a new parking lot for the Toronto Rec Centre or others?
IMG_7016.jpeg



Some new temporary wall lights being installed.
The two temporary chillers were removed from Freeland St side in the last 7 days.
_N8A1663.jpeg


The rec centre pool is not open yet. October.
 
From Saturday's island trip. Can see the Crane midway up the Toronto Star building. Pretty sure the tower wouldn't fit in the photo which is pretty crazy to think about.

Oh and a duck!
apologies for butchering a wonderful photo @tsormers but I imagine it could look (something) like this (if 344m):

Screen Shot 2023-09-20 at 00.20.56.png
 