kotsy
Senior Member
From 88 Scott
Yes, constructing parking flat slabs (drainage sloping omitted) is much more productive versus a constantly sloping parking slab or a parking slab with a ramp.If they don't have to go through the process of building ramps for the parking in one young, since they have the ramps already built in phase 1 and connected to one young through the knock-out walls, then would this be a slightly faster bottom to ground build than your general construction?
It took me good 5 min to find "KOTSY" signature on the second picture
Very cool to learn how each person can have such a different difficulty with the same picture.
that second one is really subtle.