Toronto Pinnacle One Yonge | 345.5m | 105s | Pinnacle | Hariri Pontarini

Today. Interesting to watch the excavator operator change from one type of shovel to another in order to break the rock. You could tell that the metal grinding against the rock created a lot of heat.

20180830_141616.jpg
20180830_141643.jpg
20180830_141657.jpg
 

Attachments

  • 20180830_141616.jpg
    20180830_141616.jpg
    261.1 KB · Views: 896
  • 20180830_141643.jpg
    20180830_141643.jpg
    316.5 KB · Views: 870
  • 20180830_141657.jpg
    20180830_141657.jpg
    330.4 KB · Views: 897
^ I can can see a building eventually going up on that sliver of land between the eastbound Gardiner offramp to Yonge and the rail corridor.
 
That land is owned by the City, AFAIK. The extension of the PATH to Pinnacle One Yonge is planned to pass over that space from CIBC Square, running north of 18 Yonge before turning south and running under the Gardiner similar to how the bridge from the Scotiabank Arena to One York does it.

42
 

Back
Top