Toronto Parliament Slip | ?m | ?s | Waterfront Toronto | West 8

I have seen this stone slinger spitting aggregate a couple of times over the last few months. Are they filling the basin?.

May 14
IMG_6323.jpeg


May 14 I guess New only lasts two weeks.
IMG_6326.jpeg


For a balanced meal
April 30
IMG_6332.jpeg
 
I have seen this stone slinger spitting aggregate a couple of times over the last few months. Are they filling the basin?.

May 14
View attachment 564026

May 14 I guess New only lasts two weeks.
View attachment 564027

For a balanced meal
April 30
View attachment 564028
According to Drum's posting on Monday from WT, yes.

Construction on the lakefill continues, including:

  • May 13 - June 11: Placement of infill material
  • May 13 - June 21: Placement of rock berm, including some overnight work.
 
The trucks are dumping in the fill.
As per @drum118 previous post with notice #4
“140-150 trucks per day coming down the DVP”.
I lost count today after 1.

IMG_1863.jpeg


And….”Summer Drink Days” only means two days? I don’t understand the sign business. Just a sign adjustment I guess.


Too bad they couldn’t take from the Lakeside project and fill in the slip.
IMG_1860.jpeg



Or remove this pile blocking my view of the bridge.
IMG_1864.jpeg
 

Back
Top