Toronto Ontario Line: Exhibition Station | ?m | 2s | Metrolinx | HDR

Excavation has started for the North entrance building.

DJI_20250320095938_0007_D.jpg
 
Two questions, the TBM is heading east right ? Can someone draw a circle where the tbm will be dropped in

Question 2: will exhibition stop be at grade or below grade ?
 
Two questions, the TBM is heading east right ? Can someone draw a circle where the tbm will be dropped in

Question 2: will exhibition stop be at grade or below grade ?
The TBM is massive, pretty much the entirety of the trench shown in the 1st picture
Exhibition is at-grade, but they need to get down deep to start the tunneling there.
 
The temp bridge is reopen after being closed all winter. The views are pretty great now that excavation has started!

Looking East
20250417_144901.jpg

20250417_144726.jpg

20250417_144748.jpg


Looking West
20250417_144840.jpg
 
Last edited:

Back
Top