So when they make this northern extension to Don Mills, is it going to be elevated ??
How many stops are there in-between?
Really don't see why this wasn't in the first scope of design
The current Ontario Line will be going past Wynford Drive (just south of the CP rail bridge) This tells us it will likely keep going north on Don Mills and have a minimum of 3 stops at Lawerence (Shops at Don Mills), York Mills and Sheppard (Fairview mall), if we are lucky we will get Finch (Seneca College) this is likely if Metrolinx envisions at Finch East LRT extension.
However, you never know with Metrolinx and they may throw a curveball (see below image where Metrolinx was exploring pathways for relief line north). It can also go on the below paths:
1) Curve East along the CP rail corridor and go north on Victoria Park (would be an expensive option as it would have to cross over the DVP and a ravine/valley also the Sheppard East Subway extension will probably be completed after the OL North Extension so their will be a weird lag time)
2) Go North on Don Mills but curve west and meet the Sheppard Line at Leslie Station / Oriole Go (this would be too west imo as people on busses or on the Sheppard line might as well go west for another 2 stops till the Yonge Line which would create more congestion on the Yonge Line)
3) Another option not in the below image would be along the DVP / 404 (I doubt it since there is not much density close by )
Most likely option imo is north on Don Mills till Sheppard or Finch - it would the least expensive option and could be all above ground and would be a quick build maybe 2.5 - 3 years at most) Followed by this an extension to Highway 7 BRT (Highway 16 is impossible in our lifetimes but one can hope)
For more information visit the Ontario Line North Extension forum -
https://urbantoronto.ca/forum/threa...s-relief-line-north-speculation.28508/page-43