ChesterCopperpot
Senior Member
W is the 475 Yonge Street site I believe.
Probably another Marriott here to replace the 475 site.
Nope - elsewhere from what I've seen.
W is the 475 Yonge Street site I believe.
Probably another Marriott here to replace the 475 site.
This series of 3D renderings was produced to support Quadrangle Architects in a challenging task to design a contemporary building that neighbors on a historic one. The team of architects came up with a sophisticated skyscraper design project. We elaborated and proposed several options of exterior finishing to the client. Final 3D renders feature a design solution that laconically blends in with the modern architecture as well as with the historic building.
The gist of that report is that the City wants to shift the area upon which a tower can be built to the east side of the building, where 1 Front St W is much wider because of the curve in the street, and where a new tower would be further from other nearby towers.
Not quite sure what you mean. The Feds certainly should not have appealed the new zoning in the 1990s but that's long-past and what is, what is. The Federal Government now has no interest in the building so 'thus far' is 'the end'.From the Sept TEYCC:
http://www.toronto.ca/legdocs/mmis/2017/te/bgrd/backgroundfile-106134.pdf
The Feds dropped the ball on this one - in fact, their record thus far is rather questionable.
AoD
1 FRONT ST W
Ward 28 - Tor & E.York District
►View All Properties
Official Plan and Zoning By-law Amendments to facilitate an adaptive re-use of the existing heritage building and the construction of 2 new residential towers: 8,986 square metres of new retail and service commercial space within the podium, a 251-room boutique hotel on the upper floors of the podium, and 836 dwelling units in the new towers
Proposed Use --- # of Storeys --- # of Units ---
Applications:
Type Number Date Submitted Status
OPA & Rezoning 18 199835 STE 28 OZ Jul 25, 2018 Under Review
2 new towers? I am not so sanguine about the appropriateness of that outcome
AoD