Rascacielo
Senior Member
Then they should’ve waited to hoist that beam until they were ready. But as I’ve said, by the time they are, SkyTower will have surpassed 300m and Tridel can longer claim to have the first ‘building’ in Canada to hit that mark. Oh well, such antics are to be expected when developers are in a skyscraper race (see NYC in the late 1920s).I think that they have to wait until the remaining concrete is bored before they can move forward with the tuned mass damper as it is design for the buildings weight and not having those corners complete would be hundreds of pounds of difference between what the damper is designed for and what the current building is also if you look at hawcs pictures You can see that the core is still three levels down so they cannot close the elevator core yet