Toronto One Bloor West | 308.6m | 85s | Tridel | Foster + Partners

From today. They are pouring the slab for level 68. I added a close-up shot of the lower mechanical room and an aerial view of the Yonge sidewalk. Looks like they are planning to open up the sidewalk, closer to the building, soon.

20240911_100825.jpg
20240911_110154.jpg
20240911_110206.jpg
20240911_110217.jpg
20240911_110244.jpg
20240911_134627.jpg
20240911_134630.jpg
20240911_134638.jpg
20240911_135141.jpg
20240911_141330.jpg
20240911_141336.jpg
20240911_141403.jpg
 
Apologies if this was previously posted, this is a busy thread so I might have missed it.......

But there was a move to amend the building permit here in August:

1726237712882.png


@Paclo I think this settles the height question given the timing.
 