UtakataNoAnnex
Superstar
...it sorta did the same for the first, as it's not really needed for the mechanicals outside cladding for the supes-columns, I gather.
Although it certainly could be the case, I don't think it jumped straight past the mechanical levels to the next residential ones. Compare with post by @steveve below:Looks like the platform for installing the cladding is skipping past the next mechanical level and going straight to the next set of windows?
: @ImmenselyMentalView attachment 590155
So the thing is that mizrahi is still the developer as the building has not been sold sky grid is the GC on the project and the receiver kept Sam as the developer until the building is soldJust a note to the MOD's, the title of this thread still has " Mizrahi Developments" listed at the developer. Not sure if anyone mentioned this yet so I just thought I would throw it out there.
So the thing is that mizrahi is still the developer as the building has not been sold sky grid is the GC on the project and the receiver kept Sam as the developer until the building is sold
There is no easy way out for Sam on this job.........staying as the developer could be a "burden"....My bad. I thought that was what happened originally, but I thought I read something about Sam being completely out. My spidey senses were telling me UT wouldn't over look something that..lol.
As far as I am aware, he is no longer in the driver's seat...so it's really pointless to talk about him or worry about that, IMO..There is no easy way out for Sam on this job.........staying as the developer could be a "burden"....