Brickworks
New Member
No. 31 Condos going like a house on fire this week. Also they got approval of the easement relocation. They have 2 Shoring/drilling machines going, one on south/east side and one south/west side and both are right up against the CN rail retaining wall. So the driveway between 33 Parliament and 31 Parliament was approved. Concrete pillars being poured down into the underground parking as they have 4 concrete trucks working. They moved the mobile trailer/office out on the street in front of the hydro station.
Last edited by a moderator: