Niagara Falls Niagara 77 Condos | 248.85m | 77s | Fugiel International Group | Chamberlain

About the same time as when the Leafs comeback and win the cup
And based on that pace, it took them ~20 years to get out of the 1st round. So running on that schedule, it will take another 20 years for them to get out of the 2nd round, then another 20 for the Conference Finals, and another 20 to win the Finals.

So dont expect nothing until at least ~2083.
 
For me, 6609 Stanley Avenue looks like a Bottle Opener just like in China in Shanghai.

I have no idea why you posted in the 6609 Stanley thread instead of this one, but I have moved your original post and all the subsequent ones to this thread. Please pay attention to which thread you are posting in, or your posts could be deleted in the future.

42
 
Last edited:
Construct Connect article on this building. I presume the title means 100% condo: Aura, and One Bloor East both have retail components.

 
Construct Connect article on this building. I presume the title means 100% condo: Aura, and One Bloor East both have retail components.

Weird, what's that at the top there?

1685649926766.png
 

Back
Top