Has the City got ownership of this transitway yet? If So, Have any drivers done any training on it as there is a new way for buses that will enter and leave the Transitway east of Dixie? Traffic lights working.
Work still going on at Central Parkway Station and surprise to see this as this station was almost finish early this year. Tomken and Dixie stations still missing flashing after all these months, but finish otherwise including watching the elevators working.
There is a small Kiss & wait area on the north east side of Tomken Rd.
Dixie and Eastgate intersection has been rebuilt and strip, but missing new traffic poles which is no big deal as they will be install shortly.
The plan entrance/exit from the Transitway has been relocated to the east off Eastgate with traffic light and way better than the original plan.
Phase II
The tunnel under Eglinton is complete with back filling taking place on the north side, with Eglinton going back to it original layout by year end.
Retaining walls still being built for the Transitway south of Eglinton.
Tahoe Station is well advance with steel up and concrete being pour for the platform. Roofs are cover and this station completed next year.
Bell Tahoe Station that is having the bridge over it about 75% complete with the first section of the road deck ready for concrete. Concrete walls and stairs are in place and waiting for rest of the work to start once the bridge is completed. Once the bridge is completed, Bell closed entrance will reopen so the other entrance can be close for building the bridge that is needed there for the Transitway
Phase III
The bridge over Etobicoke Creek has been built and Pave.
Spectrum Way intersection close and being dug up for a new bridge and station.
Not much else is taking place other than sewer work for the rest of it.
Phase IV
Steel up for the platforms for Erin Mills with part of the flyover in place at Winston Churchill.
Building the east side of Glen Erin bridge.
At Erin Mills, work is underway for moving the north intersection to/from 403 further north.
Phase V
No work has started on the new Renforth station or road.
Phase VI
Nothing yet on the Kipling Station.