Looks like they've reached grade level roughly throughout the entire site. While forms on the NE corner at Bathurst & Bloor, have reached the 2nd level at its highest point.
Was having a look through the plans from the development application site and I hadn’t realized that one of the facades would be using glass block, which is a great tie in to Westbank’s King project. I’m wondering if they’ll be using the same kind of system/blocks here, and if it will be a good indicator of what the cladding at King will end up looking like.