Toronto Massey Hall Revitalization at the Allied Music Centre | 48.46m | 7s | KPMB

Wed Jan 27, 2021

Set 2

B33E4E00-D52B-41FD-BE4D-A180DDA1FE35_1_201_a.jpeg



48D4BA0D-C0DD-4555-8CAD-81AA7EBE242B_1_201_a.jpeg



E4D16A3C-6280-4769-89D7-668D194A0FFF_1_201_a.jpeg



817B5C7C-6200-41A2-A1C0-16F39CB41E98_1_201_a.jpeg



68971B58-E627-46A4-B869-7ED4A5829553_1_201_a.jpeg



6CF3FF53-B9E7-432E-BEFD-7A50A346F93E_1_201_a.jpeg



FFF56422-3538-4892-9017-CB21BF8B02D7_1_201_a.jpeg



F95595FF-AE74-47D4-8ACA-9089D682FAE7_1_201_a.jpeg



37714F5A-CFF2-4BFF-A91D-69E0E6F46949_1_201_a.jpeg



F99B15CF-4EAB-47DD-9A9C-8198DC65FD4A_1_201_a.jpeg



EDAE7A0E-A151-4C4C-ADA0-8EF5898468E2_1_201_a.jpeg



9A3A2A87-7307-4ADF-A8AE-840E26CD7031_1_201_a.jpeg



FFD280B7-AD25-4CF0-B2F8-BC8BB8D07857_1_201_a.jpeg



F51CC86A-24A0-487A-829C-920E8B8B909A_1_201_a.jpeg



30D8316A-814D-4060-BBCF-4A3B736ADA8F_1_201_a.jpeg
 
Extension of sidewalk-blocking permit - to 30 April. Movin' on...

At the time of this report, the developer is finished with the major concrete works, including the roof slab. Additional major construction activities and associated timelines for the development are as follows:  Tower Crane removal in April 2021;  Streetscaping of Victoria Street and Shuter Street from April 2021 to August 2021; and  Interior work and finishing until December, 2021.

 
Ghastly is an exaggeration BUT I too am surprised it has not been washed - maybe to come??

I would more surprised if an attempt to soda blast the building was not made. It makes sense that they would wait until the building was finished to do that though given that it will still get dirty.
 
Ghastly is an exaggeration BUT I too am surprised it has not been washed - maybe to come??
I had presumed it was usually one of the last steps in the process.
 
Wait. Has Massey Hall been re-christened the Allied Music Centre? Is nothing sacred?

Does that mean they've got the cash now to open up the bricked-up windows, restore the pediment properly and give the brick a good cleaning?
 
Wait. Has Massey Hall been re-christened the Allied Music Centre? Is nothing sacred?

Does that mean they've got the cash now to open up the bricked-up windows, restore the pediment properly and give the brick a good cleaning?

No, not Massey Hall per se - the new complex. Anyways, I am not hung up over it - hardly anyone in non-official setting will ever call this "Allied Music Centre".

AoD
 