Maybe you should read the last several pages of this thread. MaRS II has been on hold for a while now, with construction ceased since sometime in December I believe. It's only now that the crane was taken down.
Maybe you should read the last several pages of this thread. MaRS II has been on hold for a while now, with construction ceased since sometime in December I believe. It's only now that the crane was taken down.
just curious, how come they don't leave the cranes up? does it cost anything to have the cranes there? does this mean that the hold will be longer than expected?
just curious, how come they don't leave the cranes up? does it cost anything to have the cranes there? does this mean that the hold will be longer than expected?
Just found this. Trying to figure out how this will work with the stump.
--------------------------------------------------------------------------
Application: Building Additions/Alterations Status: Under Review
Location: 661 UNIVERSITY AVE
TORONTO ON M5G 1L7
Ward 27: Toronto Centre-Rosedale
Application#: 09 108762 BLD 00 BA Accepted Date: Feb 11, 2009
Project: Multiple Use/Non Residential Addition(s)
Description: Proposal to construct TTC vestibule addition which connects new office building MaRS to the TTC path and "Queen's Park" subway station (120m2). Also see related building permit for new MaRS building 07-277526 BLD. Related to address 101 College St.