Toronto Maple House at Canary Landing | 89.61m | 26s | Dream | COBE Architects

From today. Not sure much has changed since ADRM's photo above, but the perspective is a bit different.

20200428_191357_HDR.jpg
 
I'm impressed by how relatively quick this is all moving.
Well, the excavation never hit bedrock so was comparatively easy to do so once they decided to move ahead they really had no excuse not to 'get it done'. Once their 'foundation raft' is completed I assume they will work quite fast actually building too.
 
One thing I've been wondering: is aA working solely as the AoR (aAAoR?) on all the buildings, or did they serve as design architects on the tallest of the three (below)?

View attachment 256475

They did design the tallest tower but that render isn't the current design. From aA on twitter:

ELDe4eeXsAEy7Ah
 