Mississauga M1 & M2 at M City | 197.81m | 60s | Rogers Real Estate | Core Architects

Both the Avia and Voya parcels got significantly taller redesigns after M City started to move. It's not out of the realm of possibility that they will go taller here. The current design for the block is basically the same height as PSV1/PSV2 but with a different design language.

voya-4-jpg.323426
 
Feb 21
There is about 160 photos up on site shot 360 from the distance as well up close.

They have relocated the hydro pole in the driveway. They have also have bendable poles in the centre of Burnhamthrope where the traffic light are to be install late this year so no one can get to/from Parkside Village at this time going eastbound.

The best I can see from the numbers on the elevator shaft and floor count above the last number, M1 is at the 56 floor and M2 at 50. The odd thing, there not much different height wise between PSV 1 at 49 floors plus mech to M1. There seems to be more than 6 floor different between M1 and M2
51903064946_170c8677ee_b.jpg

51903389299_068f147432_b.jpg

51903154068_0b51c5099b_b.jpg

51902684416_e66b113610_b.jpg

51902776048_d728736d9d_b.jpg

51902685446_188c407a8a_b.jpg

51903315890_b7a6520aaf_b.jpg

51903314810_46c644c43c_b.jpg

51902664541_8e872c2b48_b.jpg

51902664941_cacd1c0776_b.jpg

51903309440_4f7a51e7fc_b.jpg

51902992829_69a160c13a_b.jpg

51901690667_3d25845d82_b.jpg

51903301005_a4ed855cf5_b.jpg

51903271460_65f95d3d14_b.jpg

51902955069_5273ff928b_b.jpg
 
I think your floor counting is off. By my count they are just starting on floor 54 on M1 and 51 or 52 on M2 depending on whether they are counting the two level ground ‘townhouses’ as one or 2 floors.
 
I think your floor counting is off. By my count they are just starting on floor 54 on M1 and 51 or 52 on M2 depending on whether they are counting the two level ground ‘townhouses’ as one or 2 floors.
Planning on shooting the elevators from a different location to see if I can get a clear shot of the numbers than I shot the next few days.
 
I counted the same... so do you guys think the building will be closing later this year?
By my count, M1 is at floor 54 and M2 is at 51 or 52.

There are still tons of internal work to be done so I doubt if there would be any occupancy this year though they usually do it in phases and the lower floors might be ready by then provided all the necessary services and safety measures are in place and pass inspection.

Closing will probably happen few months after occupancy once the condo is incorporated.
 
  • Like
Reactions: AHK
March 21 & 22
No matter where I shoot these towers from, there is at least 5 floor different considering M2 was the first out of the ground. Since M1 was first sold first, it has to be the first to be done.

As it stands, M1 is the official tallest tower in Mississauga now and to be join by M2 shortly until 2024 when M3 will pass them on its way to be the tallest. Depending on the the towers at Exchange being built, both M1 & M2 will slip to the 3rd tallest in 2024 and then fall to the run of the mill as more towers past then.
51958820258_5922d499f3_b.jpg

51958757241_33e4b0bc35_b.jpg

51958820043_880788b0ec_b.jpg

51957651941_49e5971f42_b.jpg

51957714008_804a04dc9f_b.jpg

51957949739_c3228ba7b1_b.jpg

51957714108_ca0d17d8ba_b.jpg

51957652161_205351489b_b.jpg

51956614287_29a32512e9_b.jpg

51956614382_091efdba6f_b.jpg

51958105940_5cc503ea15_b.jpg

51957582888_33ea027684_b.jpg

51956531787_e0b4e9d60d_b.jpg
 

Back
Top