Toronto Ivy Condos | 102.41m | 32s | Dream | RAW Design

IMG_0196.jpeg
IMG_0197.jpeg
 
Yesterday (July 21). Crane taken down and laying at the foot of the tower

IMG_9444.jpeg


IMG_9443.jpeg


Edit: looking at the last few pictures, seems that the crane has been down for a while. Then there was the stop work order relating to the crane, which seems to have been resolved. Maybe they’re trying to put the crane UP again? Because that crane on the street definitely belongs to this building.
 
Last edited:
I know I'm not the first to mention this... I'm sure.... but, I can't imagine the disappointment of buying pre-con only to discover you're not getting a balcony...
This must've been discussed before. Right?
I've apparently not kept up with this project and suddenly have opinions.
 
I know I'm not the first to mention this... I'm sure.... but, I can't imagine the disappointment of buying pre-con only to discover you're not getting a balcony...
This must've been discussed before. Right?
I've apparently not kept up with this project and suddenly have opinions.
indeed, very disappointing. it was discussed before. but there is nothing much you can do about it - it's the risk of buying pre-built. but this builder definitely has lost its reputation for me.
 
Does anyone have the latest updates and photos, has the site resumed work? My check-in has been postponed from September 1st to January next year
 

Back
Top