Toronto Islington Terrace | 145.08m | 45s | Tridel | Kirkor Architects

November 25th, 2018.

KEZ_2602.jpg
 
Drive-by from the weekend. Did my best to highlight our city's electrical infrastructure.

DSC00375.jpg
DSC00376.jpg
DSC00377.jpg
DSC00379.jpg


42
 
April 17
The 3rd crane was in the process of being install when I was by the site today. They were installing the cab and took some shots of it being place as well the whole project. Will post when I get them tag this weekend.
 
From Royal York and Bloor, and then from much closer;

DSC00851.jpg
DSC00852.jpg
DSC00853.jpg
DSC00854.jpg
DSC00855.jpg


42
 
I am a fan of the precast grid: it turns bland window wall into something that pops a bit dammit, it pops!

42
 

Back
Top