For the construction of the LRT, tracks will be laid along the centre guideway of Hurontario Street between Matheson Boulevard and Britannia Road, requiring partial east-west intersection closures or additional left-turn restrictions in the area. The partial closure at Aldridge Street/Traders Boulevard and Hurontario Street is scheduled from October 4, 2022 until October 27, 2022. East-west traffic as well as left-turns will be restricted during this time. Track installations at Matheson Boulevard and Hurontario Street from October 28, 2022 until December 15, 2022 occur within two sub-stages. In the first stage, the north side of the intersection will be closed from October 28, 2022 to November 19, 2022. This will be followed by the south side from November 19, 2022 to December 15, 2022. During these stages, east-west traffic will be maintained along Matheson Boulevard, but reduced to a single lane in each direction. Left-turns at this intersection will not be permitted. In order to weld tracks together and form the concrete, it will be necessary to partially close the Matheson/Hurontario intersection to eastbound and westbound traffic. East/west traffic will be detoured to Milverton Drive/Watline Avenue. During these east/west closures, traffic will continue to travel north and south on Hurontario. The first partial closure will be from November 25, 2022 until November 28, 2022. The second will be from December 10, 2022 to December 11, 2022.