Collingwood Harbour House | 26m | 6s | Streetcar | CEBRA architecture

PXL_20231031_145004919.jpg
 
Yeah it took us 20 years to get this building built. It is by far the nicest building in town. Just hoping that they don't quash phase 2 which is an identical six story as well as another six story just down the road. I have to do a trip around to create some more threads soon as there are a few projects that are in the planning phases and I think if we can get eyes on them and more people paying attention to these projects
 
Harbor House is getting so close to being formed out. Can't wait till they start the roof structure. This building looks a thousand times better than the perfect world project that is due to block it
 
Last edited:
The proximity of this and future phases to the rail ROW and beautiful station building only furthers my lust for a GO Transit extension to Collingwood.

This does get brough up a lot, and it may not be priority work at the current moment, but the transit situation trying to get here for a hike or snowboard or swim is embarrassing. At the very least a GO Bus pilot over a year long period from Allandale Waterfront Station to test the ridership potential.

1000005891.jpg


It will look quite nice once filled in with similar density and restaurants and stuffs.

1000005886.jpg
 

Back
Top