Actually, they are not driving piles but drilling out the holes for a caisson wall. Some of the nearby buildings would likely be damaged by actual pile driving.
I'd guess that the excavation has gone down about 12 feet or so. They seem to be waiting for the caisson wall to be completed before proceeding. That work hasn't even started for the Adelaide building.