A 6264
Active Member
Current bus service on Eglinton is so bad, whatever happens next can't be worse. (Crosses fingers.I think service being limited from reduced frequency along with all bus routes being adjusted to final configuration assuming full capacity may lead to overcrowding. Sort of like funnelling everything into a less than adequate sized pipe, causing water to build up. In this case it would be passengers transferring from buses on the platforms trying to enter full trains. The existing parallel bus service will have the frequencies reduced or removed entirely, so there is no reasonable alternative.
However, without actually seeing projections and simulations I don't feel it is guaranteed to happen.
Also, I used to agree that bus service along Eglinton would likely be removed in future, but everyone on here was telling me I was wrong!




