jcam
Active Member
When Metrolinx did the press release saying that major schedule changes were coming to the Kitchener Line effective November 23 (link), it made me wonder if that would coincide with the Mount Dennis station opening, and therefore Line 5 opening. I guess that date is still possible even if this testing has to restart, theoretically at least.




