Ok. I want to say as someone who uses UPX daily that when Mount Dennis opens this service will basically become a subway.
UPX will be a RAPID TRANSIT Line. Without One Fare Program transfers with your PRESTO.

However, the Mt. Dennis GO Station will accept One Fare Program transfers with the TTC.
 
UPX will be a RAPID TRANSIT Line. Without One Fare Program transfers with your PRESTO.

However, the Mt. Dennis GO Station will accept One Fare Program transfers with the TTC.
The GO doesn’t run frequent enough to be considered rapid transit and will remain pretty useless for the majority of the riders.
 
Not before, but on. But that is the current plan, yes.

Dan
My understanding is that they are prepared during this next board period to open everything if Line 5 is ready for opening mid board. They even isolated blocks and crews on the 32 and 34 for redeployment for when it's ready to open.
 
My understanding is that they are prepared during this next board period to open everything if Line 5 is ready for opening mid board. They even isolated blocks and crews on the 32 and 34 for redeployment for when it's ready to open.
My understanding is that they are prepping to open the line with the new board on November 16th, or even after if necessary. Yes, many of the crews have been isolated on the 32 and 34 to be garage-to-garage in order to make them easier to reschedule for this board, but that's more of a function of the lead times required to create the boards themselves - when the October boards were originally written, the hope was that the line would open for the October board period. That obviously has slipped.

Dan
 
My understanding is that they are prepping to open the line with the new board on November 16th, or even after if necessary. Yes, many of the crews have been isolated on the 32 and 34 to be garage-to-garage in order to make them easier to reschedule for this board, but that's more of a function of the lead times required to create the boards themselves - when the October boards were originally written, the hope was that the line would open for the October board period. That obviously has slipped.

Dan
Wouldn't be surprise to see the line open sometime Firday or Sat after all the talking is done as well the cutting of the ribbon and the VIP trip ride. Quality of service will be light for the rest of the day with all bus routes remaining as is with the full change over on the Sunday.
 
The GO doesn’t run frequent enough to be considered rapid transit and will remain pretty useless for the majority of the riders.
The Kitchener GO Train is planned for 15-minute headways during rush hours, 30 minutes other times. Future plans are for 15 minute, but being Metrolinx...

For American commuters, 15 minutes is "frequent" for them.
 

Extended: Platform Remedial Works on Eglinton Avenue East between Brentcliffe Road and Kennedy Road​

8537bc0d-2cf9-4fd4-b1f1-442774376847.png
What Work is Taking Place?
Works expected to be completed by mid-October 2025 will continue until late-October 2025. Crews will continue remedial works at platform stops along Eglinton Avenue East, between Brentcliffe Road and Kennedy Road. To facilitate this work safely, periodic short-term rolling lane closures will be in place.

Crews will move along the guideway, performing remedial works at one location at a time. Remedial activities include the replacement of damaged guardrails and platform shelter glazing panels as needed, cleaning of guardrails and glazing panels, and concrete remedial repairs at platform stops as needed. Access to properties will be maintained.

One lane of traffic will be maintained on Eglinton Avenue East. This work is expected to take place on Monday – Friday, between 7:00 a.m. and 5:00 p.m. On occasion, work may be required to take place on Saturday – Sunday, between 8:00 a.m. and 4:00 p.m. Upon completion of this work, periodic short term lane reductions may be required on Eglinton Avenue East to facilitate special activities.​
What to Expect
  • Concrete barriers, fencing, and signage will be in place to delineate the work zones.
  • Noise from construction activities can be expected.
  • One lane of traffic in each direction will be maintained.
  • Expect delays while travelling through the area.
Hours of Work
  • Through until approximately late-October 2025.
  • This work is expected to take place from Monday – Friday between approximately 7:00 a.m. and 5:00 p.m.
  • On occasion, work may be required to take place on Saturday – Sunday, between 8:00 a.m. and 4:00 p.m.
  • Work may be rescheduled due to weather or unforeseen circumstances.
  • This work may be longer or shorter than expected.
Traffic Details
  • Periodic short-term rolling lane closures will be required on Eglinton Avenue East between Brentcliffe Road and Kennedy Road.
  • One lane of traffic in each direction will be maintained.
Pedestrian Details
  • No changes to the current pedestrian routes are expected because of this work.
Transit Information
  • Access to TTC will be maintained.
  • For the latest updates, visit ttc.ca.
 
The Kitchener GO Train is planned for 15-minute headways during rush hours, 30 minutes other times. Future plans are for 15 minute, but being Metrolinx...

For American commuters, 15 minutes is "frequent" for them.
The American 15 minutes depends on the systems and it more like 30-60 on systems I have seen. Even LRT service starts at 15 depending on the day and time of day.

People here complain about how bad our service is over 10 minutes and should be glad they don't use the US systems as anything under 15 minutes is premium service to the US systems as well in Europe.
 

Extended: Platform Remedial Works on Eglinton Avenue East between Brentcliffe Road and Kennedy Road​

8537bc0d-2cf9-4fd4-b1f1-442774376847.png
What Work is Taking Place?
Works expected to be completed by mid-October 2025 will continue until late-October 2025. Crews will continue remedial works at platform stops along Eglinton Avenue East, between Brentcliffe Road and Kennedy Road. To facilitate this work safely, periodic short-term rolling lane closures will be in place.

Crews will move along the guideway, performing remedial works at one location at a time. Remedial activities include the replacement of damaged guardrails and platform shelter glazing panels as needed, cleaning of guardrails and glazing panels, and concrete remedial repairs at platform stops as needed. Access to properties will be maintained.

One lane of traffic will be maintained on Eglinton Avenue East. This work is expected to take place on Monday – Friday, between 7:00 a.m. and 5:00 p.m. On occasion, work may be required to take place on Saturday – Sunday, between 8:00 a.m. and 4:00 p.m. Upon completion of this work, periodic short term lane reductions may be required on Eglinton Avenue East to facilitate special activities.​
What to Expect
  • Concrete barriers, fencing, and signage will be in place to delineate the work zones.
  • Noise from construction activities can be expected.
  • One lane of traffic in each direction will be maintained.
  • Expect delays while travelling through the area.
Hours of Work
  • Through until approximately late-October 2025.
  • This work is expected to take place from Monday – Friday between approximately 7:00 a.m. and 5:00 p.m.
  • On occasion, work may be required to take place on Saturday – Sunday, between 8:00 a.m. and 4:00 p.m.
  • Work may be rescheduled due to weather or unforeseen circumstances.
  • This work may be longer or shorter than expected.
Traffic Details
  • Periodic short-term rolling lane closures will be required on Eglinton Avenue East between Brentcliffe Road and Kennedy Road.
  • One lane of traffic in each direction will be maintained.
Pedestrian Details
  • No changes to the current pedestrian routes are expected because of this work.
Transit Information
  • Access to TTC will be maintained.
  • For the latest updates, visit ttc.ca.
Is this gonna put the RSD at risk?
 
The American 15 minutes depends on the systems and it more like 30-60 on systems I have seen. Even LRT service starts at 15 depending on the day and time of day.

People here complain about how bad our service is over 10 minutes and should be glad they don't use the US systems as anything under 15 minutes is premium service to the US systems as well in Europe.
Don’t compare to American cities, they are the barrel bottom standards. Comparing to European and East Asian standards, our reliability is quite bad. Especially when 10 minute means 10 min average ranging between 1-20 minutes. The GO has better scheduling but they are still using century old diesel technology trains.
 

Extended: Platform Remedial Works on Eglinton Avenue East between Brentcliffe Road and Kennedy Road​

8537bc0d-2cf9-4fd4-b1f1-442774376847.png
What Work is Taking Place?
Works expected to be completed by mid-October 2025 will continue until late-October 2025. Crews will continue remedial works at platform stops along Eglinton Avenue East, between Brentcliffe Road and Kennedy Road. To facilitate this work safely, periodic short-term rolling lane closures will be in place.

Crews will move along the guideway, performing remedial works at one location at a time. Remedial activities include the replacement of damaged guardrails and platform shelter glazing panels as needed, cleaning of guardrails and glazing panels, and concrete remedial repairs at platform stops as needed. Access to properties will be maintained.

One lane of traffic will be maintained on Eglinton Avenue East. This work is expected to take place on Monday – Friday, between 7:00 a.m. and 5:00 p.m. On occasion, work may be required to take place on Saturday – Sunday, between 8:00 a.m. and 4:00 p.m. Upon completion of this work, periodic short term lane reductions may be required on Eglinton Avenue East to facilitate special activities.​
What to Expect
  • Concrete barriers, fencing, and signage will be in place to delineate the work zones.
  • Noise from construction activities can be expected.
  • One lane of traffic in each direction will be maintained.
  • Expect delays while travelling through the area.
Hours of Work
  • Through until approximately late-October 2025.
  • This work is expected to take place from Monday – Friday between approximately 7:00 a.m. and 5:00 p.m.
  • On occasion, work may be required to take place on Saturday – Sunday, between 8:00 a.m. and 4:00 p.m.
  • Work may be rescheduled due to weather or unforeseen circumstances.
  • This work may be longer or shorter than expected.
Traffic Details
  • Periodic short-term rolling lane closures will be required on Eglinton Avenue East between Brentcliffe Road and Kennedy Road.
  • One lane of traffic in each direction will be maintained.
Pedestrian Details
  • No changes to the current pedestrian routes are expected because of this work.
Transit Information
  • Access to TTC will be maintained.
  • For the latest updates, visit ttc.ca.
I have plenty of food. I think I'll just stay home until Spring.
 